Give three reasons why a verification of polarity test is carried out in a completed domestic installation.
(Solved)
Give three reasons why a verification of polarity test is carried out in a completed domestic installation.
Date posted:
September 18, 2019
.
Answers (1)
List three metal parts that are exempted from earthing in a domestic installation.
(Solved)
List three metal parts that are exempted from earthing in a domestic installation.
Date posted:
September 18, 2019
.
Answers (1)
Name the logic gate shown in figure 3 below
(Solved)
Name the logic gate shown in figure 3 below.

Figure 3
Name.............
Date posted:
September 18, 2019
.
Answers (1)
State the role of Directorate of Industrial Training.
(Solved)
State the role of Directorate of Industrial Training.
Date posted:
September 18, 2019
.
Answers (1)