State any two common faults found in ceramic capacitor.
Answer Attachments
Next: Nzundu and Theku bought a building for Kshs.12,000,000. Nzundu paid Kshs.8,000,000 while Theku paid Kshs.4,000,000. The building was insured for 8,000,000 against the...
Previous: On a 250 volts supply,a fault having a resistance of 20 ohms develops between the unearthed end of the winding of an electric heater and...
View more Electricity Questions and Answers | Return to Questions Index
Draw a line diagram of a national grid system showing typical voltages at each stage.
Date posted: September 18, 2019 . Answers (1)
Give three reasons why a verification of polarity test is carried out in a completed domestic installation.
List three metal parts that are exempted from earthing in a domestic installation.
Name the logic gate shown in figure 3 below.Figure 3Name.............
State the role of Directorate of Industrial Training.